Step 2

Step 2 – Carrying out the measures

In Step 2 the energy saving measures in the action package are carried out. The focus here is on the quality of the work and on making sure that the designed intent will lead to the expected energy savings.

Step 2 is divided into the following tasks:

  • Planning and designing the measures
  • Construction work and installations
  • Functional performance checks

Basically, the tasks in Step 2 are the same as in any normal reconstruction project. However, mistakes must be avoided at all costs as the expected energy savings, and the whole point of carrying out a Total Concept project, could otherwise be lost. The functional and performance checks are significant in order to reach the expected results. It is important to ensure that the measures that have been carried out function properly from the very beginning.