Reports
Improving the Energy Performance in Existing Non-residential Buildings in Denmark Using the Total Concept Method
Functional performance checks of Demand Controlled Ventilation – The load tests Max-max-min and Min-min-max, Paper ID 176
Improving the Energy Performance in Existing Non-residential Buildings in Denmark Using the Total Concept Method
Functional performance checks of Demand Controlled Ventilation – The load tests Max-max-min and Min-min-max, Paper ID 176
In autumn there will be following courses and seminars:
> Breakfast seminars on Total Concept method
> Introduction seminars to Total Concept method, its possibilities and benefits as well as examples of renovation projects.
The seminar is targeting all actors involved in the building renovation process.
Stockholm 8/9 at 7:30 – 9:00 Breakfast is served from 7:30 Read more (in Swedish)
Göteborg 9/9 at 7:30 – 9:00. Breakfast is served from 7:30 Read more (in Swedish)
Day 1 is targeting property owners, clients, consultants, design engineers and contractors and gives an insight to economical evaluations and work process of the Total Concept method, guidelines for tendering. Day 2 is concentrating on practical work in Step 1, creating the action package and is targeting different service providers in Total Concept work process, incl. energy consultants, design engineers, architects and contractors.
Course dates:
Göteborg 11/10 and 25/10 Read more (in Swedish)
Malmö 12/10 and 26/10 Read more (in Swedish)
Stockholm 12/1 and 26/1
For more information: www.byggherre.se
Reaching near passive house-level for the Norwegian Public Road Administration (NPRA) Office in Steinkjer with the use of Total Concept method
The Norwegian Public Road Administration (NPRA) office in Steinkjer, Norway is a pilot/case study for Total Concept which is currently in step 2. The ambition is to reach near passive house-level for windows, walls, roof ventilation and artificial lighting, therefore upgrading the building’s energy efficiency. Five major energy efficiency measures are carried out because they are profitable. Total Concept method concludes that investing in a ground source heat pump will not be profitable. However, the property owner Statsbygg plans to invest on this as a measure for improving energy efficiency. , The project includes deep retrofitting by replacement of windows and doors with better U-value of 0,8 W/m2K. Added insulation in roof and walls, upgrading to demand controlled artificial lighting and demand controlled ventilation for both increased comfort and reduced energy use. The project is carried out according to the progress plan with its deadline in October 2016.
The Norwegian Public Road Administration (NPRA) Office in Steinkjer, Norway, consists of three wings built in different building phases; 1967, 1976 and 1984.
From the three pilot buildings in Sweden two of them have proceeded to Step 2 and Step 3. In the first pilot building, Högsbo 20:22 office building in Gothenburg, Step 2 was carried out in summer 2015 and monitoring and follow-up (Step 3) is currently ongoing. The preliminary results show that the savings in electricity are even somewhat higher than expected.
In the second pilot building, Norrtälje prison, two measures out of five have been carried out (change of lighting and replacement of doors) and two measures are currently planned to be carried out (process ventilation and façade insulation). Monitoring and follow-up work in Step 3 is currently planned and will start in autumn.
In autumn there will be following courses and seminars:
Breakfast seminars on Total Concept method
Seminars give an introduction to Total Concept method, its possibilities and benefits as well as examples of renovation projects. Seminar is targeting all actors involved in the building renovation process.
Seminar dates:
Göteborg 8/9 at 7:30 – 9:00. Breakfast is served from 7:30
Stockholm 9/9 at 7:30 – 9:00 Breakfast is served from 7:30
Two days training course on Total Concept method implementation.
Day 1 is targeting property owners, clients, consultants, design engineers and contractors and gives an insight to economical evaluations and work process of the Total Concept method, guidelines for tendering. Day 2 is concentrating on practical work in Step 1, creating the action package and is targeting different service providers in Total Concept work process, incl. energy consultants, design engineers, architects and contractors.
Course dates:
Göteborg 11/10 and 25/10
Malmö 12/10 and 26/10
Stockholm 12/1 and 26/1
For more information: http://www.byggherre.se/
Download the new Tool kit version 1.5
Advertising video for the Total Concept course with SINTEF’s Mads Mydsen
Danish and Norwegian language versions of the Tool kit version 1.4 are now available for downloading.
If you have questions or technical difficulties, please contact our Helpdesk
> Download the Total Concept profitability calculation tool TotalTool (totaltool_2_setup.exe)
Dansk/Danish
Norsk/Norwegian
Sintef and VVS-föreningen, the HVAC federation of Norway, are arranging a 2 day course in Total Concept on May 12 and May 13.
> Read more (Norwegian)
An updated version, version 1.4, of the Total Concept tool kit is now available as download.
Download
Click here to go to download site