Total Concept

Major reduction of energy use in non residential buildings

Skip to content
  • Home
  • Final Report
  • Login
  • Pilot Buildings Denmark
  • Pilot Buildings Estonia
  • Pilot Buildings Finland
  • Pilot Buildings Norway
  • Pilot Buildings Sweden
  • Summary of the pilot studies
  • About the project
    • Project objectives and outcomes
    • Expected outputs
    • Project partners and supporters
    • Prerequisites for implementation
    • Target groups
    • Background to the method
  • About the method
    • The Total Concept method
    • Pilot buildings
    • Step 1
    • Step 2
    • Step 3
    • Stakeholders and key actors
    • Start of a Total Concept project
    • Guidelines and tools
    • Leaflet and brochure
Total Concept

New Tool kit version 1.4 out now!

An updated version, version 1.4, of the Total Concept tool kit is now available as download.

Download
Click here to go to download site

This entry was posted in Uncategorized on December 22, 2015 by Magnus Brink.

Post navigation

← Video: Meeting Total Concept Norway: Course in Total Concept →

Recent Posts

  • Final Report
  • The implementation of the Total Concept in the five participating countries are facing a new phase.
  • Step 3 measurements has started in the first Total Concept project in Norway
  • The fourth Total Concept course in Norway!
  • Newsletter 3: October 2016

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Proudly powered by WordPress